The development of all the Nagpur Maha Metro stations has been boosted in recent days. The speedily development of the stations can be seen on reach 1 and reach 3 as well, however on the Wardha Route (Reach 1) the train service has already started and the Hingna Route (Reach 3) will be getting a kick start soon.
It can be seen that the actual construction of metro station is beyond the concept design of what was published by Nagpur Maha Metro when the station work was about to begin.
Maha Metro station of Khapri is done with the construction and is ready to use for the citizens. The stations decoration has mesmerizing paintings and are even the main attraction amongst the other decorations on the wall. Maha Metro Khapri station is decorated with marble carvings and jute artifacts along with few ceramics and metal carvings. An attempt has been done to give the metro station a traditional look and the decoration is also made to attract the passengers and boost the tourism.
Besides its decoration, the station is facilitated with amenities for physically challenged passengers and senior citizens and even the kids which includes separate ticket counter and toilets and even the elevators. The station is even draining power from the solar panels.
Get all the latest and current news Nagpur here. For an exclusive & live updates from the Nagpur, stay connected with THE LIVE NAGPUR.