The reach 3 i.e Airport metro station of Nagpur is all set to be functional from the first week of September. The aqua line from Lokmanya Nagar to Sitabuldi has been almost completed, in which 80 % of physical work is totally done. Looking at the work progress, all stations are completed much faster than the assumed period of time.
The concept design of Airport Metro Station is made on modern architectural terms, the station also has few other add-on which makes it different yet better than what was shown in the concept plan. It has got solar panels at the top of every metro stations, which will be effective in generating electricity for the running metro as well as the stations.
Even the surroundings of the station has got a pleasant view with trees and plants spread in the vicinity and at the same time the National Highway plays a dramatic role with the yellow street light smoothening the view.
The stretch of Khapri Metro Station to Sitabuldi is considered as an important and most beautiful one in all the Metro routes. It also can be seen clearly that the total work done and the construction exceeds the expectation from the design that was imagined during the start of the metro construction.
Get all the latest and current news Nagpur here. For an exclusive & live updates from the Nagpur, stay connected with THE LIVE NAGPUR.