The concretization of roads in every sense creates troubles in traffic. It has been reported that one of the busiest highway in Nagpur city, Bhandara- Raipur National Highway from HB town to Pardi Naka is being blocked for concretization. The concretization has been done by National Highway Authority of India (NHAI).
This highway will be blocked for at least two months during which only cars and two-wheelers will be permitted to enter the one-sided open route. The exact date of closure has been decided yet but is assumed to be starting from the end of October.
The route which is supposed to be blocked already facing traffic problems. It will be a major challenge for the city’s traffic department to control this heavy traffic. The route will be blocked for 200 meters at four different locations at the same time.
The traffic department has also given permission to block the left side of the road from Nag River to HB square. The route from Hanuman Nagar to Nag River will be blocked from the right side. Any required permissions in future will be given by the traffic department regarding the pace of work.
Get all the latest and current news Nagpur here. For an exclusive & live updates from the Nagpur, stay connected with THE LIVE NAGPUR.