The traffic of heavy vehicles on Butibori-Umrer road is being diverted to the outer ring road. The traffic is being diverted in view of construction work of railway over bridge (ROB) over two railway lines between Butibori and Borkhedi
The heavy vehicles from Butiboi towards Umrer are being diverted on outer ring road (NH 53). The ROB is being constructed jointly by Maharashtra Rail Infrastructure Development Corporation Limited and Railway Ministry. The traffic will be diverted till completion of the project. It is expected to be complete by March 2023Light vehicles – two wheelers and four vehicles can use the railway gate for crossing the road patch. The map relating to the diversion has been installed at suitable points, informs District Collector Dr Vipin Itankar