Central Railway will operate a special infrastructure block between Thane and Diva for cut & connection works and commissioning of new RRI building in Diva in connection with Thane-Diva 5th and 6th lines. The block will be operated as under –
On Existing 5th line and 6th line between Thane and Diva from 00.00 hrs of 5.2.2022 to (Saturday/Sunday midnight 12 am) to 24.00 hrs of 7.2.2022 (Monday/Tuesday midnight 12 am) 72 hours.
On Existing Up fast line from 00.00 hrs (midnight 12 am) of 5.2.2022 to 04.00 am of 6.2.2022 (28 hrs)
Cancellation of Express trains
1) 12140 Nagpur-Mumbai Sewagram Express Journey Commencing on 04.02.2022 & 05.02.2022
2) 12139 Mumbai-Nagpur Sewagram Express Journey Commencing on 05.02.2022 & 06.02.2022
Up Mail /Express trains departure from Kalyan after 23.10 hrs on 04.02.2022 (Fri/Saturday Night) onwards to till completion of UP fast line block i.e. 04.00 hrs on 06.02.2022 will be diverted on Up slow line from Kalyan to Mulund stations and Mail/Express trains during this period will not halt at Thane station.
Passengers are requested to bear with the Railway Administration for the inconvenience caused due to this infrastructure block.