Load Test was successfully completed at Gaddigodam between Kasturchand Park and Automotive Square Metro Stations in Reach-II.
The test involved stationing of trains at the location with stipulated load.
The collective load of two metro trains and sand bags kept on the track was 460 ton. The test is conducted to test the strength of the viaduct.